Specifications |
|
Die capacity: cycle time(with/without core) |
approx 60s (depend on workpiece) |
|
Daily capacity: per shift approx 450 castings |
Per shift approx 450 castings |
|
Change time of preheating die |
5min |
|
Max. die dimensions |
500mm x 400mm |
|
Max. die thickness |
2x 100mm |
|
melting capacity |
300 kg/H |
|
Channel induction furnace/content |
1800kg (3 inductors/1800kg) |
|
Machine control system |
beckhoff CX 1000 |
|
Furnace control system |
stepless with thyristors |
|
Electronic control of electric driving1.5kw |
1.5kw |
|
Furnace |
300kg/H |
|
Energy consumption at the highest melting |
90kw |
|
Power consumption at furnace heat preservation |
35kw |
|
The cooling of furnace toils |
soft water (approx 4 French hardness, 40ppm) |
|
Water bursting |
3-5pa, 30 0 C, the lowest 20 0 C |
|
Returning water |
the highest 1pa, the highest temperature 50 0 C |
|
Ability of water supply |
the lowest 15L/min, the highest 80L/min, cycle |
|
The cooling of inductor(90kw furnace) |
8m³ /min, 3600N/m 2 |
|
Gas consume: Propane Natural gas |
Approx 0.225m³ /h, at 0.5 pa pressure Approx 1.300m³ , at 1800N/m³ pressure |
|
Machine size(L x W x H) |
(4000 x 3000 x 2500)mm |
|
Weight |
Approx 8T |